JORF LASFAR SWRO Wave 2 East Plant 60.000 m3/d

in the same industrial zone of Jorf Lasfar, we success the acheivement of second SWRO desalination plant with the capacity of 60.000m3 per day . The plant started to produce since sept 2025. MMSA confirm its presence and capability as a sinificant national company on desalination plant specialy big scale.
EPS Scope for SWRO Plant
- EPS including design, engineering, procurement, construction and commissioning supervision
- Seawater intake Pumping Station
- Self cleanning Filters 04 units
- Ultrafiltration skids 20 skids
- Cartridge filters 04 units
- Dosing systems Pretreatement, treatement and post treatement
- One pass RO system 50% Recovery. 3 Skids, 845 m3/h each
- Energy recovery through pressure exchanger, 10 PX400 per RO skid
- Electrical package MV substations, VFD, MCC and UPS