Location of Project: JORF (Morocco) Project Description: In the scope of DAP Jorf, 70 km of metalic pipe and fittings have been supplied and transformed to piping spools.
Location of Project: JORF (Morocco) Project Description: In the scope of DAP Jorf, 70 km of metalic pipe and fittings have been supplied and transformed to piping spools.
Location of Project: SAFI et JORF (Morocco) Project Description This Plant is a part of the increase and expansion of existing SWRO unit, the intended solution is to provide a 150 MLD for both Jorf and Safi site and cities, the solution adopted is Modular unit of SWRO. The Project consists in the following units:
Location of Project: Jorf Lasfar (Morocco) Project Description: This Plant is a part of a Wave II Fertilizer expansion, that represents 3 lines of Fertilizers at Jorf Lasfar, which is the biggest complex in the Country. The Project consist in the following units: Design and supply on level wise and drive frame packaging the Structure